Natural Choice Foods Freezer Addition

type

Cold Storage

Location

Marne, Michigan

General Contractor

Pinnacle Construction

Designer/Architect

XRS Engineered Solutions Inc.

Supplier

Falk Panel

square footage

135,000 sq ft headquarters

Duration

3 Months

Scope of work

Thermline played an integral role in the early stages of the project, providing both
budget estimates and design input. This proactive involvement likely helped to ensure the project stayed on track, both financially and in terms of design goals.


The decision to use Insulated Metal Panels (IMPs) for the cooler and freezer building is an important one, as these panels offer key benefits:


1. Thermal Insulation: IMPs are excellent at maintaining temperature control, which is
crucial for the efficiency of coolers and freezers. They help reduce energy costs by
preventing heat transfer between the interior and exterior of the building.
2. Durability: These panels are highly durable and resistant to wear and tear, which is vital in environments that need to withstand low temperatures and potential exposure to moisture.
3. Speed of Installation: Since the panels are pre-fabricated and designed for quick
installation, this helps keep the project on schedule.
4. Cost-Effectiveness: IMPs help to keep costs down in the long term due to their energy efficiency and low maintenance needs.

Experts in Insulated Metal Panels | Architectural Metal Panels | Siding | General Contracting | Specialty Contracting