M.E.V.S. (Magna Electric Vehicle Structures) Phase 2

type

Industrial

Location

St Clair, Michigan

General Contractor

Weiland

Designer/Architect

William A. Kibbe & Associates

Supplier

Falk Panel

square footage

140,000 sq ft of IMP

Duration

6 Months

Scope of work

M.E.V.S. Phase 2 was a fast-paced project that demanded streamlined workflows and execution excellence. Due to Thermline’s proven track record of delivering high-quality work, on time and within budget, Weiland Construction once again chose Thermline as their building envelope partner for this large addition. Thermline’s expertise in building envelope systems was key to the success of the project, where they were responsible for designing, supplying, and installing Insulated Metal Panels (IMP) and Aluminum Composite Materials (ACM) to the exacting standards set in the construction documents.

Experts in Insulated Metal Panels | Architectural Metal Panels | Siding | General Contracting | Specialty Contracting