Meijer DC 89

type

Cold Storage

Location

Lansing, Michigan

General Contractor

Rockford Construction Company 

Designer/Architect

Structura

Supplier

Metl-Span

square footage

30,000 sq ft of IMP

Duration

5 Months

Scope of work

Rockford Construction partnered with Thermline to design and construct a new shipping dock connected to a -10 degree freezer. This project presented several unique challenges, especially given the need to integrate a cold shipping dock with direct access to a freezer set at such low temperatures. Thermline’s expertise in IMP, thermal breaks, and properly designed portals played a critical role in successfully navigating and implementing these challenges to create a functional, efficient, and safe cold storage solution.

Experts in Insulated Metal Panels | Architectural Metal Panels | Siding | General Contracting | Specialty Contracting