Meijer DC 84 Expansion

type

Food & Beverage

Location

Lansing, Michigan

General Contractor

Rockford Construction Company

Designer/Architect

Bergmann

Supplier

Metl-Span

square footage

62,000 sq ft of IMP

Duration

4 Months

Scope of work

Rockford Construction and Meijer partnered with Thermline Inc. to supply and install Insulated Metal Panels (IMP) for an addition to their facility in Lansing, Michigan. In addition to their work on the new construction, Thermline also addressed and corrected multiple envelope leakage issues that were caused by improper design and installation in the original building. Thermline’s expertise in building envelope systems played a crucial role in resolving these issues and ensuring the long-term performance and efficiency of the facility.

Experts in Insulated Metal Panels | Architectural Metal Panels | Siding | General Contracting | Specialty Contracting